← Back to work

06 / Music

MDL Soundstorm 2021 – Dance Stage

Riyadh, Saudi Arabia, Dec 2021MEDIAPRO AV

Project case study

Role, scope & approach

Project overview

The 2021 MDL Soundstorm Dance Stage required a distributed video workflow: media servers were positioned behind the screen while control remained at front of house. The distance between those positions shaped the technical preparation for the Riyadh festival.

Technical role

Alfonso supported system configuration, connectivity and server preparation for the Dance and Down Stage racks, with direct responsibility for organizing the Dance Stage rack.

Technical approach

d3 and Resolume systems were connected through fiber runs and extenders for long-distance signal management. The work focused on rack organization, integration support and readiness before the system entered live operation.

  • media servers
  • disguise / d3
  • Resolume
  • fiber signal transport
Expanded project view